REFSHEET-Kai-Tak-Cruise-Terminal-mainimg

Hong Kong

Kai Tak Cruise Terminal

Project description

The Kai Tak Cruise Terminal is built on the former site of the Kai Tak Airport in Hong Kong. The terminal has the capacity to berth two 360m-long vessels. On peak days the Cruise Terminal can cater for up to 8400 passengers and 1200 crew members.

The cruise terminal was designed by Foster + Partners and its roof spans over 70 m. Its multi-functional design allows the terminal to be converted into a venue for exhibitions and other events.

The total area of the Cruise Terminal is 52,000 m2 and it also encompasses a rooftop garden which is open to the public.

mageba scope

A total of 1060 LASTO-BLOCK elastomeric bearings were used in the construction of the Kai Tak Cruise Terminal. All mageba elastomeric bearings installed in the Cruise Terminal are made from high-quality elastomer, reinforced by steel plates.

The RESTON POT bearings used for this project have maximum load carrying capacity of Vmax= 3,800 kN and ensure the controlled transfer of loads.

mageba RESTON POT bearings are equipped with a special POM seal which is vulcanised directly into the bearing pad and hence improves the wear resistance of the bearing significantly.

REFSHEET-Kai-Tak-Cruise-Terminal-elastomeric-bearing

mageba LASTO-BLOCK elastomeric bearings, ready for delivery

REFSHEET-Kai-Tak-Cruise-Terminal-img2

The Kai Tak Cruise Terminal during construction

En bref

Products:

RESTON-POT bearings, LASTO-BLOCK elastomeric bearings

Installed:

2012

City:

Hong Kong

Structure:

Cruise Terminal

Area:

52,000 m2

Builder:

Dragages Hong Kong