Refsheet-Quartier-Milaneo-mainimg

Alemania

Milaneo Mailänder Square

Project description

In the city center of Stuttgart, the residencial building complex around Mailänder Square was equipped with highly effective vibration isolation.

43,000 m2 of retail space, 7,400 m2 of office areas and 8,500 m2 of hotel space lying on a load distribution plate supported by elastomeric bearings, installed on a support grid system underneath the construction.

The bearings must transmit all vertical and horizontal loads and additionally insulate the housing against vibrations.

mageba scope

• 3,304 VIBRAX-BLOCK B elastomeric bearings with static-dynamic design and setting to a natural frequency of f0 = 13 Hz

• Execution of the fire protection F90 around the elastomer bearings for all essential supporting elements

• Formwork covers for the bearings at the joints of prefabricated components of the load distribution plate

Refsheet-Quartier-Milaneo-img2

VIBRAX-BLOCK B bearing under load distribution plate

Refsheet-Quartier-Milaneo-img3

VIBRAX-BLOCK B vertical bearing ready for the load distribution plate

Puntos destacados

Product:

VIBRAX-BLOCK B vibration isolation

Installation:

Ed. Züblin

City:

Stuttgart

Country:

Germany

Structure:

Building construction

Construction:

Reinforced concrete

Completed:

2014

Owner:

Bayerische Hausbau GmbH

Contractor:

Ed. Züblin