Chongqing Dongshuimen Yangtze River Bridge

Project description

The Chongqing Dongshuimen Yangtze River Bridge is located in the city of Chongqing and connects the Yuzhong district with the Nan’an district. Official opening to traffic was in 2014.

The bridge acts as the urban secondary trunk road and starts from Tushan Road, Nan’an district, crosses the Yangtze River, leads through the Huguang Guild Hall and finally ends at Shan’xi Road, Yuzhong district.

It is a combined bridge including upper and lower decks. The main bridge is a double tower and single cable plane cable-stayed steel truss girder bridge with a main span of 520 m, a deck width of 21 m and an overall length of 1’000 m.

mageba scope

In 2013, mageba installed several TENSA-MODULAR expansion joints of type LR3 and LR8 as well as TENSA-GRIP RS single gap joints for the Chongqing Dongshuimen Yangtze River Bridge.

TENSA®MODULAR expansion joints allow free movements in all directions and rotations about every axis. The largest joints delivered, type LR8, can accommodate movements of up to 640 mm.

TENSA-GRIP RS single gap joints can facilitate movements of up to 80 mm. The joints consist of robust steel edge profiles and replaceable elastomeric sealing profiles, which ensure long-lasting watertightness. The drainage of the joints is accomplished by the drainage system of the bridge deck.

Refsheet-Dongshuimen-Bridge-img1

An 8-gap TENSA-MODULAR expansion joint ready for transport

Refsheet-Dongshuimen-Bridge-img2

Detailled view of the displacement box welded on the steel box girder

Data chave

Products:

TENSA-MODULAR expansion joints of type LR3 and LR8; TENSA-GRIP RS single gap joints

Installed:

2013

City:

Chongqing

Structure:

Cable-stayed bridge

Completion:

2014

Length:

1 km

Owner:

Chongqing City Construction Investment Corporation

Contractor:

MBEC

Architect:

Liu Xiaohui

Designer:

China Merchants Chongqing Communications Research & Design Institute; T. Y. Lin International