Refsheet-New-Champlain-Bridge-mainimg

Canadá

New Champlain Bridge

Project description

The Champlain Bridge is located in Montreal, Canada, and will be replaced by the new bridge over the St. Lawrence River. This crossing will be one of the busiest in Canada with over 60 million vehicles and $20 Billion in international trade passing over it on a yearly basis.

The $4.2 billion project will consist of two main bridges – the New Bridge on the St-Lawrence and the Île-des-Soeurs Bridge and is scheduled for completion in December 2018.

mageba scope

mageba will be providing Structural Health Monitoring Service for this iconic bridge.
Over the project duration, over 50 embedded and 150 surface sensors will be installed on the bridge, allowing the Government of Canada to monitor displacement, corrosion, movements, temperature, stresses, strain and environmental conditions of the bridge over the next 30 years.

This will most certainly optimize maintenance and increase the lifespan of the structure. Moreover, the ingenious system provides the ability to re-act instantly to changes and deterioration.

Refsheet-New-Champlain-Bridge-img1

Installation of first sensors at the main towers

Refsheet-New-Champlain-Bridge-img2

Easy access to mageba‘s comprehensive web interface

Data chave

Products:

ROBO-CONTROL permanent Monitoring System

Features:

Approx. 200 sensors

Installed:

2016–2018

City:

Montreal

Structure:

Cable-stayed bridge

Completion:

Scheduled for 2018

Owner:

Infrastructure Canada

Contractor:

SNC Lavalin, Dragados, Flatiron Canada, TY Lin, MMM Group

Designer:

Arup