I-65 Deck Replacement

Project description

The I-65 Deck Replacement in Gary, Indiana was a project that intended to transform the outer shoulders of the bridge into new traffic lanes.

These new traffic lanes would begin south of the I-90 and end at the I-80. The project also covered replacing old shoulders converted to accommodate traffic, with new ones, and replacing the existing I-65 Bridge over the Little Calumet River with a new structure.

mageba scope

mageba provided two 45 ft. (13.72 m) TENSA-MODULAR LR4 modular expansion joints for the project, to be used for free movement in all directions featuring barrier cover plates.

Each joint was installed in two sections as traffic remained open on the bridge.

Due to the spacing in the bridge deck, welding the joint sections together was not possible. mageba utilized its bolted splice connection design for this ­application.

All of the joint’s well-proven wear resistant parts can be replaced with little effort and without disrupting traffic in the future.

Refsheet-I-65-Deck-Replacement-installation-of-TENSA-MODULAR-LR

Installation of one of the supplied TENSA-MODULAR expansion joint

Refsheet-I-65-Deck-Replacement-modular-joint-installed

Modular expansion joint after installation

Data chave

Products:

TENSA-MODULAR joints of type LR4

Feature:

Barrier cover plates

Installation:

2018

City:

Gary, IN

Main span:

80 ft. (24 m)

Length:

1,210 ft. (869 m)

Owner:

INDOT

Contractor:

Superior Construction Co., Inc.