REFSHEET-AVE-Antequera-Granada-railway-Viaducto-mainimg

İspanya

AVE Antequera-Granada railway

Project description

Spain’s AVE high-speed railway system is currently the longest high-speed rail network in Europe with a length of approximately 3100 km, and the second longest in the world (after China’s). The system’s first line commenced service in 1992, and its trains travel at speeds of up to 310 km/h.

A new line to Granada in southern Spain is to cross a highly seismic area with irregular topography. The project in question relates to the construction of a viaduct on the line - a single continuous pre-stressed concrete deck with 12 spans and a total length of 580m.

mageba scope

The design of the viaduct requires its deck to be connected to one of its abutments by shock absorbers which generally act as rigid connections but which dissipate energy and protect the structure from overloading during a large earthquake. mageba’s innovative solution is a shock absorber featuring a specially developed fused connection. The devices were designed and tested in accordance with EN 15129, with testing carried out at leading testing institutes in both Europe and the United States.

REFSHEET-AVE-Antequera-Granada-railway-Viaducto-testing-fuse-element

A fuse element (without shock absorber) in testing at Politecnico di Milano, Italy

REFSHEET-AVE-Antequera-Granada-railway-shock-absorber

A shock absorber, fully assembled with fuse element and ready for transport to site

Anahtar veri

Products:

RESTON-SA shock absorber with fuse

Installed:

2014

City:

Loja

Structure:

Concrete rail viaduct

Length:

580 m

Contractor:

AZVI

Owner:

AVE Renfe Operadora