The Y-Bridge is a single-track steel bridge with a double-span girder. The center support of the structure has a Y-shape and it is flexible in the horizontal direction.
The superstructure of the bridge was supported by roller bearings originally, which are now prone to break, therefore they were required to be replaced.
A quick action was needed since one of the roller bearings at the eastern abutment of the bridge had already broken.
One of the greatest challenges was to meet the project’s tight timeframe to plan and prepare the construction work.
Despite of this difficulty, the replacement of the bearings was successfully completed in due time.
Roller bearings can support large loads by rolling on a flat surface along one axis in the longitudinal direction of the bridge, but not in the transverse direction (rotation).
mageba’s RESTON-CYLINDER bearing however, is capable of accommodating loads by sliding on a curved surface along both axes, and due to the similar geometrical features of the two bearing types only minor upgrading measures were necessary on the existing superstructure.
As the general contractor, mageba was responsible for every aspect of this complex project.
The traffic safety measures included in the scope of services were also much more complicated than originally planned due to the local conditions.
Products: | RESTON-CYLINDER bearings |
Installation: | 2022 |
City: | Bischofsheim / Gustavsburg |
Type: | Single-track steel bridge |
Length: | 48 m |
Main span: | 26 m |
Completion: | 2023 |
Owner: | DB Netz AG |
Contractor: | DB Netz AG |
Engineer: | Büro IWS, Idstein / Taunus |