Headquarters:
mageba sa
Trafostrasse 1
8180 Bulach
Switzerland
Tel: +41-44-872 40 50
Fax:
The Naini Bridge, also known as New Yamuna Bridge, is located in the northern Indian state of Uttar Pradesh. With a length of 1,510 m – including a main span of 260 m – it is one of the longest cable-stayed bridges in India. In the course of a major bridge renovation that is currently ongoing, bearing and expansion joint replacement work was required, and mageba was awarded the contract to supply the necessary items. Huge RESTON®SPHERICAL bearings were supplied to replace the existing pot bearings, and a six-gap TENSA®MODULAR expansion joint was supplied to replace the existing modular-type joint.
The new bearings are especially notable for the large displacements of +/- 780 mm they are designed to accommodate. In addition to the associated design and fabrication work, our team in Kolkata was also responsible for much of the work on site – in the case of the bridge bearings they provided the expert supervision of installation, and in the case of the expansion joint they carried out the complete replacement work. This was made all the more challenging by the requirement to keep traffic flowing on the bridge at all times, and by the very tight schedule imposed by the overall project. Happily, the work was completed within the time allowed and without stopping traffic – a good result for a bridge that is so important to the transportation needs of this heavily populated region.
Consultant: COWI
Contractor: Freyssinet Menard India (P) Ltd
Owner: National Highways Authority of India