Project description

The Yamashiro region lies between the Shigaraki mountains and is featured with many roads and highways due to its proximity to the famous cities Kyoto, Nara and Osaka.

In order to refurbish the Shimomura bridge, owner and constructor were looking for a flexible and reliable solution to replace the existing asphalt plug joints.

mageba scope

JTEC Company is an exclusive distributor of mageba’s flexible plug expansion joint POLYFLEX-ADVANCED PU. In order to provide a Japan-wide valid solution for infrastructure projects, tests have been performed and successfully passed at the Japan Construction Method & Machinery Research in Stitute, Fuji.

The 12-step installation process is a standard procedure that allows lane-by-lane refurbishment and re-opening to traffic within 72 hours. This quick and trained installation has the advantage of avoiding extensive effects for traffic as well as keeping the work for the constructor and owner as low as possible. POLYFLEX-ADVANCED PU also demonstrates the perfect suitability for the application in urban areas.

Moreover, the complete flush surface with the adjacent asphalt results in no additional noise emission to the environment. Another advantage is zero maintenance of the system.

Refsheet-Shimomura-Bridge-img1

Step 6 of the installation process: Preparation for installation of steel angles and coverplate

Refsheet-Shimomura-Bridge-img2

Step 10 of the installation process: Filling with POLYFLEX-ADVANCED PU material

Key Data

Products:

POLYFLEX-ADVANCED PU of type PA40

Features:

6.8 m and 6.7 m length

Installation:

2015

City:

South Yamashiro City, Kyoto

Structure:

National road bridge

Construction:

around 1990

Owner:

City of Kyoto

Constructor:

Yamashiro Civil Engineering Constructors

Engineer:

Kyoto Prefectural Office