Refsheet-MRT-Sungai-Buloh-mainimg

Malaysia

MRT Sungai Buloh – Kajang line

Project description

The Kuala Lumpur MRT Sungai Buloh-Kajang (SBK) Line is a 51 km long railway that connects Sungai Buloh, north-west of Kuala Lumpur, with Kajang in the south-east, while passing through the densely populated centre of the federal capital.

The line will serve 1.2 million people in the Klang Valley who had poor access to the rail network. It’s expected to carry 442,000 passengers a day.

mageba scope

The Kuala Lumpur MRT is equipped with 358 units of RESTON-POT bearings. 115 of these are RESTON-POT UPLIFT bearings which are designed to resist temporary uplift forces.

The RESTON-POT bearings installed have a maximal load carrying capacity of 23,000 kN.

Refsheet-MRT-Sungai-Buloh-RESTON-POT-bearings

mageba RESTON-POT bearings during production

Refshhet-MRT-Sungai-Buloh-image

The MRT Sungai Buloh-Kajang Line

Key Data

Type:

RESTON-POT bearings

Installation:

2013–2015

City:

Kuala Lumpur

Built:

2012–2016

Type:

Mass Transit System

Length:

51 km

Owner:

Mass Rapid Transit Corporation Sdn Bhd

Builder:

UEM