Refsheet-North-Bridge-Trilogiport-mainimg

Belgium

North Bridge Trilogiport

Project description

Within the course of the construction of the Liege “Trilogiport” multimodal platform a new bridge across the River Maas as well as a semi motorway interchange were built in order to enable heavy vehicles coming from Liege or Holland to reach directly the platform.
Located 1’400 m downstream, the bridge of Argenteau is approximately 300 m long. Its largest span is 88 m in length and crosses over the River Maas.

mageba scope

mageba supplied 32 RESTON®SPHERCIAL bearings and four TENSA®MODULAR joints for the project.
The Spherical bearings were designe with a vertical load capacity between 5’000 kN and 28’700 kN.
The movement capacity of the expansion joints is 160 mm for the LR2 and 240 mm for the LR4.

Refsheet-North-Bridge-Trilogiport-spherical-bearings

Spherical bearings type KEQ with sliding protection

Refsheet-North-Bridge-Trilogiport-modular-expansion-joint

Installed modular expansion joint with four movement gaps

Key Data

Products:

RESTON®SPHERCIAL bearings type KA, KE and KF, TENSA®MODULAR expansion joints type LR2 and LR4

Installed:

2013

City:

Visé

Completion:

2015

Owner:

Walloon Authority

Designer:

Greisch

Structure:

Traffic bridge

Length:

300 m