Upon completion in 2017, the $106-million Nipigon River Bridge will be the first cable-stayed bridge of its kind on the Ontario highway system. The 252 meters (827 feet) bridge will consist of three towers with cables supporting the bridge deck and a separate sidewalk for pedestrians.
Nipigon River is renowned for its brook trout and the bridge is located directly in a spawning area, presenting environmental challenges.
mageba will deliver all expansion joints for this bridge. This includes a 37 meter long
TENSA-FINGER GF sliding finger joint accommodating both vertical (20 mm) and longitudinal (160 mm) displacements. mageba will also provide a TENSA-FINGER RSFD cantilever finger joint which will allow a 160 mm longitudinal displacements.
Products: | TENSA-FINGER expansion joints of type GF (sliding) and RSFD (cantilever) |
Features: | Vertical movements allowed |
Installed: | 2017 |
City: | Town of Nipigon, Ontario |
Structure: | Cable stayed bridge |
Length: | 252 meters (827 feet) |