当前主题

新型建筑地震监控工具

在地震期间以及地震后做出正确的决定是拯救生命和财产的关键因素。我们很自豪能够率先将最新的云计算技术与我们在地震工程方面的专业知识相结合,将物

mageba Group appoints a new Area Director for South-East Asia

mageba Group is glad to announce that Mr. Lim Boon Teck has been appoi

News-Earth-Quake-Monitoring-for-Buildings-robo-quake-box-sensors-buildings
Jobs-helmets-bridge

COVID-19 – Situation at mageba Group

At mageba Group, the health and safety of our employees and customers

HP意为高性能

玛格巴RESTON®POT HP高性能盆式支座在各方面都优于标准的盆式支座,现已通过了欧洲技术评估(ETA)- 取代了以往的欧洲技术认可。

NEWS-Icon-world-COVID19
NEWS-ETA-HP-Pot-Bearing-manufacturing-NL-image

项目案例

德国

Köhlbrand Bridge Hamburg

The Köhlbrand Bridge has been connecting Wilhelmsburg Elbe Island with

Products:

TENSA MODULAR expansion jonts LR8 „QUICK-EX-System“, TENSA MODULAR expansion joints SILENT LR8- LS100 „QUICK-EX-System“ with ROBO-DUR Stützrippen, TENSA MODULAR expansion joint SILENT LR10 / LR8-LS100 mit ROBO-DUR support ribs

Installation:

2014–2016

City:

Hamburg

Type:

Cable-stayed bridge

澳大利亚

Gateway Bridge

To increase road capacity in the state of Queensland in Australia, the

Products:

TENSA MODULAR expansion joints

Features:

Movement between 320 and 640 mm

Installed:

2010

City:

Brisbane

瑞士

Quai Bridge Zurich

The Bellevue is classified as one of Zurich‘s central traffic junction

Products:

TENSA-CRETE single gap joints of type RE-LS 100

Features:

With rail trough and noise-reducing sinus plates

Installation:

2015

City:

Zurich

马来西亚

2nd Penang Bridge

The Second Penang Bridge is the longest bridge in Southeast Asia with

Products:

TENSA-MODULAR type LR & LR-LS, TENSA-GRIP Type RS-B

Features:

Anti-seismic design and noise-reducing sinus plates

Installed:

2013

City:

Penang

美国

Tappan Zee Bridge

The New Tappan Zee Bridge, also known as the New NY Bridge and officia

Products:

TENSA-MODULAR LR expansion joints, RESTON-STU shock transmission units

Features:

Joints designed for movements of up to 54 inches (1.4 meters), STU capacity 800 kips

Installed:

2015–2018

City:

New York

俄罗斯

Krymsky Bridge, Moscow

The Krymsky Bridge was built in 1938 as the first fixed crossing over

Type:

TENSA-FLEX RC200 finger joints

Features:

Quick-replacement joints under traffic

Installed:

2015 (2001)

City:

Moscow

尼加拉瓜

Piedrecitas and 7 South Bridges

The project consists of two “Y” shaped overpasses, the intersection 7

Products:

TENSA®MODULAR modular joints type LR11

Installed:

2018

City:

Managua

Completion:

2018

Refsheet-Koehlbrandbrueckemainimg
GatewayBridge-mainimg
Refsheet-Quaibrücke-Zürich-mainimg
REFSHEET-Penang-Bridge-mainimg
Newsletter-TappanZee-NightBridge-hr-approved-rendering
Refsheet-Krymsky-Bridge-mainimg
Refsheet-Piedrecitas-and-7-South-Bridges-mainimg